Run planning, current
instructions to shifters
| J.Rutherfoord,
Draft list of FCal personnel
[.txt] |
E-logbook
Special runs
Hardware-related notes and memos
|
J.Rutherfoord,
Setting
the FEB Gain Thresholds for the FCal [.doc] [pdf]
|
|
D. Mergelkuhl, H6
2004 survey report [.pdf] |
|
Reports
|
J.Rutherfoord, Scanning the crack [.pdf
.doc]
The goal of the ATLAS LArG 2nd
EndCap Combined Beam Test (CBT-EC2) in
summer 2004 is to scan the two overlapping transitions between the EMEC/HEC
and the FCal. However it was discovered that the modules are too low in the
H1 cryostat to adequately cover the entire transition (crack) region. This
report describes the problem, discusses the various constraints, and
proposes a solution.
|
DAQ-related notes and memos
|
P.Gorbunov, H6 Beam Fragment Format [pdf] |
|
P.Gorbunov, BeamDaq classes to interface the beam crate with the ROS
[pdf] |
|
P.Gorbunov, Documentation on the DAQ-related
NIM
Crate #6 (platform) and NIM
Crate #1 (control room) - layout, logics, timing diagrams etc
|
|