Run planning, current instructions to shifters
bullet

Global run plan

bulletPlan for 10 September 2003

Run summaries
bullet

June-July 2003 (physics runs, large table) [Excel]

bulletSummary of good physics runs v.1,  by P. Krieger   [Excel]
Plain-text version:
- chronological list of runs (PDF) comments
- data matrix
- electrons 4L   4H   position-scan
- pions     4L   4H   position-scan 

- muons
 

Shift schedules
bullet

September 2003 (draft PK 28/08/03) [.ps] [pdf]

bulletJune-July 2003 (v.6) [.ps] [pdf]

Shifter's documentation
bullet

Run-sheet

bulletCheck-list

Special runs
bulletP.Gorbunov, Calibration run types in FCal beam tests, Draft 2.0 22-Nov-2003 [.doc] [pdf]

 

CBT-EC2 (EMEC/HEC/FCal Combined TestBeam Run) in 2004 (official WWW site)

Run planning, current instructions to shifters
bulletJ.Rutherfoord, Draft list of FCal personnel [.txt]

E-logbook
bulletHow to access from an offline code:  Guide (.txt), Dictionary (.txt)

Special runs
bullet 

Hardware-related notes and memos
bullet

J.Rutherfoord, Setting the FEB Gain Thresholds for the FCal  [.doc] [pdf]

bullet

D. Mergelkuhl, H6 2004 survey report [.pdf]

 

Reports

bullet

J.Rutherfoord, Scanning the crack [.pdf .doc]       The goal of the ATLAS LArG 2nd EndCap Combined Beam Test (CBT-EC2) in summer 2004 is to scan the two overlapping transitions between the EMEC/HEC and the FCal. However it was discovered that the modules are too low in the H1 cryostat to adequately cover the entire transition (crack) region. This report describes the problem, discusses the various constraints, and proposes a solution.

 

DAQ-related notes and memos

bullet

P.Gorbunov, H6 Beam Fragment Format [pdf]

bullet

P.Gorbunov, BeamDaq classes to interface the beam crate with the ROS [pdf]

bullet

P.Gorbunov, Documentation on the DAQ-related  NIM Crate #6 (platform) and NIM Crate #1 (control room) - layout, logics, timing diagrams etc